Project Reference

Wastewater Treatment Plant – Organic

Wastewater Treatment Plant for Food & Beverage Processing Industry in Senai, Johor

Project Description
To design & build of new wastewater treatment plant by biological and physico-chemical process
Industries Category Food/ Beverage Processing
Treatment Capacity 410 m3/day
Year of completion 2013
 
WWTP Overview   WWTP Overview
WWTP Overview   WWTP Overview
 
Aeration Tank   Coagulation and Flocculation Tank
Aeration Tank   Coagulation and Flocculation Tank
 
Multimedia Filter & Activated Carbon Filter   Filter Press
Multimedia Filter & Activated Carbon Filter   Filter Press
 
Chemical Tank Area   Final pH Adjustment Tank & Final Monitoring Tank
Chemical Tank Area   Final pH Adjustment Tank & Final Monitoring Tank
 
 

Wastewater Treatment Plant for Food Additives Processing Industry in Tampoi, Johor

Project Description
To upgrade existing wastewater treatment plant’s treatment process by introducing our Dissolved Air Flotation (DAF) system in the Physico-chemical treatment process, Circular Counterflow Sedimentation for biological treatment process as well as chemical dosing treatment process.
Industries Category Food Additives Processing Industry
Treatment Capacity From 350 m3/day upgrade to 550 m3/day
Year of completion 2016
 
WWTP Overview   WWTP Overview
WWTP Overview   WWTP Overview
 
DAF Unit   Circular Counterflow Sedimentation
DAF Unit   Circular Counterflow Sedimentation
 
 

Membrane BioReactor (MBR) Wastewater Treatment System Upgrading for Food & Beverage Processing Industry in Senai, Johor

Project Description
To upgrade existing wastewater treatment plant by using Kubota MBR for higher biological treatment performance due to production of different products
Industries Category Food/ Beverage Processing
Treatment Capacity 410 m3/day
Year of completion 2018
 
Overall WWTP Plant
 
Aeration Tank   Treatment for Pre-Acetic Acid (PAA)
Aeration Tank   Treatment for Pre-Acetic Acid (PAA)
 
New Blower Line    Building extension for treating PAA
New Blower Line   Building extension for treating PAA
 
Overall MBR System
 
MBR Tank Area   Air Diffuser
MBR Tank Area   Air Diffuser
 
MBR in Clean Water   MBR in Clean Water
MBR in Clean Water   MBR in Clean Water
 
MBR Clean Water Test   MBR tank with wastewater
MBR Clean Water Test   MBR tank with wastewater
 
Installation Work   Installation Work
Installation Work   Installation Work
 
 

Wastewater Treatment Plant Upgrading – Filter Press, Activated Carbon, Sedimentation, Bio Zero Tank

Project Description
To upgrade existing wastewater treatment by design and contrast additional tank to enhance the wastewater treatment process
Industries Category Chemical Manufacturing
Year of completion 2018
 
Control Panel   MMF and ACF
Control Panel   MMF and ACF
 
MMF and ACF   Sedimentation Tank
MMF and ACF   Sedimentation Tank
 
Aeration Tank   Aeration Tank
Aeration Tank   Aeration Tank
 
Blower Piping Connection   Blowers
Blower Piping Connection   Blowers
 
Wastewater Treatment Plant – Inorganic

Chemical Wastewater Treatment System for Rubber and Plastic Manufacturing Industry in Senai, Johor

Project Description
To construct a new wastewater treatment plant by using Physico-chemical precipitation treatment process with a secondary activated carbon filtration polisher.
Industries Category Industrial Rubber and Plastic Manufacturing
Treatment Capacity 7 m3/day
Year of completion 2018
 
WWTP Overview   Chemical Tank Area
WWTP Overview   Chemical Tank Area
 
Sand Filter & Activated Carbon Filter   Sand Filter & Activated Carbon Filter
Sand Filter & Activated Carbon Filter   Sand Filter & Activated Carbon Filter
 
 

Waste Water Treatment Plant for Consumer Discretionary Products Manufacturer Industry in Kempas, Johor

Project Description
To design & build of new wastewater treatment plant for Gospel wastewater treatment by using mechanical Physico process and pH adjustment process.
Industries Category Fabricated Metal Product Manufacturing/ Nonferrous Metal (except Aluminum) Production  and Processing
Treatment Capacity 44.8 m3/day
Year of completion 2019
 
Overall WWTP
 
WWTP Overview   WWTP Overview
WWTP Overview   WWTP Overview
 
WWTP Overview   Activated Carbon Filter
WWTP Overview   Activated Carbon Filter
 
Sewage Treatment Plant

Sewage Treatment Plant for Glass Disk for Hard Disk Drive Manufacturer Industry in Merlimau, Melaka

Project Description
To design and build of 250 population equivalent (PE) Sewage Treatment Plant
Industries Category Tech Hardware & Semiconductors
Treatment Capacity 250PE
Year of completion 2008
 
Overall Sewage Treatment Plant
 
STP Overview   STP Overview
STP Overview   STP Overview
 
Sludge Drying Bed   STP Overview
Sludge Drying Bed   STP Overview
 
 

Sewage Treatment Plant for Optical Glass and Glass Products Manufacturer in Merlimau, Melaka

Project Description
To design, construct, and commissioning a 250 Population Equivalent (PE) Sewage Treatment Plant
Industries Category Glass and Glass Products Manufacturing/Nonmetallic Mineral Product Manufacturing
Treatment Capacity 250 PE
Year of completion 2008
 
Overall Sewage Treatment Plant
 
STP Overview   STP Overview
STP Overview   STP Overview
 
Waste Gas Treatment

Counter-current Packed Column Wet Scrubber for Semiconductor Industry in Kota Bahru, Kelantan

Project Description
To design and build of counter-current packed column wet scrubber system for Acid and Alkaline Fumes Removal with special discharge chimney design to meets customer height requirement at the factory’s roof location.
Industries Category Semiconductor Industry
Treatment Capacity 16,500 CFM Acid Scrubber & 3600CFM Alkaline Scrubber
Year of completion 2019
 
Acid Scrubber
 
Overview of Acid Scrubber System   Overview of Acid Scrubber System
Overview of Acid Scrubber System   Overview of Acid Scrubber System
 
     
     
 
Alkaline Scrubber
 
Overview of Alkaline Scrubber System   Overview of Alkaline Scrubber System
Overview of Alkaline Scrubber System   Overview of Alkaline Scrubber System
 
Control Panel   Control Panel
Control Panel   Overview of Alkaline System
 
 

Counter-current Packed Column Wet Scrubber for Rubber and Plastic Manufacturing Industry in Senai, Johor

Project Description
To design and build of counter-current packed column wet scrubber system for combined Acid and Alkaline Fumes Removal
Industries Category Industrial Rubber and Plastic Manufacturing Industry
Treatment Capacity 10,000 CFM
Year of completion 2019
 
Overall Scrubber
 
Overview of Scrubber System   10,000 CFM Scrubber System
Overview of Scrubber System   10,000 CFM Scrubber System
 
Overview of Scrubber System   Control Panel
Overview of Scrubber System   Control Panel
 
 

Moretana Scrubber and Venturi Scrubber for Food Additives Processing Industry in Tampoi, Johor

Project Description
To design & build of Patented Moretana™ combined Venturi scrubber system for Production Fine Powder (Solid Particulate) Removal
Industries Category Food Additives Processing Industry
Treatment Capacity 9,000 CFM
Year of completion 2015
 
Overall Scrubber
 
Overview of Scrubber System   Overview of Scrubber System
Overview of Scrubber System   Overview of Scrubber System
 
Overview of Scrubber System   Overview of Scrubber System
Overview of Scrubber System   Overview of Scrubber System
 
 

Counter-current Packed Column Wet Scrubber for Electro and Electroless Plating Chemicals Manufacturing Industry in Pasir Gudang, Johor

Project Description
To design & build of new counter-current packed column wet scrubber system for acid fumes removal of client R&D Laboratory & Clean Room Pilot Plant
Industries Category Chemical Manufacturing
Treatment Capacity 8,000 CFM for R&D Laboratory and 6,500 CFM for Clean Room Pilot Plant
Year of completion 2019
 
Overall Scrubber
 
Overview of Scrubber System   8,000 CFM Scrubber
Overview of Scrubber System   8,000 CFM Scrubber
 
6,500 CFM Scrubber   Control Panel
6,500 CFM Scrubber   Control Panel
 
 

Counter-current Packed Column Wet Scrubber for Hot-Dip Galvanizing Industry in Tanjung Langsat, Johor

Project Description
To design and build of new counter-current packed column wet scrubber system for acid fumes removal from galvanizing process include production galvanizing process tank package suction hood
Industries Category Galvanizing Process
Treatment Capacity 50,000 CFM
Year of completion 2017
 
Overall Scrubber
 
Overview of Scrubber System   Production Exhaust Ducting
Overview of Scrubber System   Production Exhaust Ducting
 
Suction Hood   Pumps
Suction Hood   Pumps
 
Control Panel   Installation Work
Control Panel   Installation Work
 
Fan & Scrubber (Before installation)   Installation Work
Fan & Scrubber (Before installation)   Installation Work
 
Industrial Purewater System

Reverse Osmosis Water Treatment System for Electronic Component Manufacturing Industry in Kuching, Sarawak

Project Description
To design & build of new plug & play skid-based type Reverse Osmosis (RO) system for purification water supply to production manufacturing process.
Industries Category Electronic Component Manufacturer
Treatment Capacity 1.2 m3/hr
Year of completion 2017
 
Overview of RO System   Overview of RO System
Overview of RO System   Overview of RO System
 
Overview of RO System   Overview of RO System
Overview of RO System   Overview of RO System
 
 

Reverse Osmosis Water Treatment System for Food & Beverage Processing Industry in Senai, Johor – Industrial Pure Water System

Project Description
To design and construct RO system for production use
Industries Category Food/ Beverage Processing
Treatment Capacity 25m3/hr
Year of completion 2013
 
Overview of Softener & RO water treatment plant   Multimedia Filter & Activated Carbon Filter
Overview of Softener & RO water treatment plant   Multimedia Filter & Activated Carbon Filter
 
RO Membrane   RO System and Cartridge Filter
RO Membrane   RO System and Cartridge Filter
 
 

Reverse Osmosis Water Treatment System Upgrade for Food & Beverage Processing Industry in Senai, Johor

Project Description
To upgrade existing RO system by increase the supply capacity by adding additional RO line
Industries Category Food/ Beverage Processing
Treatment Capacity From 25 m3/hr to 30 m3/hr
Year of completion 2018
 
Overview of Softener & RO Water Treatment Plant   Overview of Softener & RO Water Treatment
Overview of Softener & RO Water Treatment Plant   Overview of Softener & RO Water Treatment Plant
 
Overview of Softener & RO Water Treatment   Softener
Overview of Softener & RO Water Treatment Plant   Softener
 
 
 
Solid Waste Management

Dehydrator Treatment System for Epoxy Manufacturer in Pasir Gudang, Johor

Project Description
To design and build of auto-recessed plate filter press for dehydrating sludge for wastewater treatment plant process.
Industries Category Chemical Manufacturing
Treatment Capacity 800L/cycle and 1200L/cycle
 
Filter Press System
 
Filter Press System   Filter Press System
 
Filter Press System   Filter Press System
 
 

Dehydrator Treatment System for Vacuumerize Insulated Containers Industry in Philippines

Project Description
To design & build of Auto recessed chamber plate filter press for dehydrating sludge for wastewater treatment plant process.
Industries Category Metalworking Machinery Manufacturing
Treatment Capacity 200L/cycle
 
Filter Press System
 
Filter Press System   Filter Press System
 
Filter Press System    
 
 

Dehydrator Treatment System for copper foil manufacturer in Philippines

Project Description
To design & build of auto combination membrane-chamber plate filter press for high performance of dehydrating sludge for wastewater treatment plant process.
Industries Category Metalworking Machinery Manufacturing
Treatment Capacity 1100L/cycle
   
 
Metalworking Machinery Manufacturing   Metalworking Machinery Manufacturing
 
 
Malaysia

Johor, Malaysia

Kasui Techno Sdn. Bhd.

No.47A, Jalan Molek 2/4, Taman Molek,
81100 Johor Bahru, Johor, Malaysia.
call
+60 (0) 7-352 7118
print
+60 (0) 7-352 5277
mail
info@kasui.com.my
 
Malaysia

Negeri Sembilan, Malaysia

KT Advance System Sdn. Bhd.

No.49-2B, Jalan MSJ 2, Medan Perniagaan
Senawang Jaya, 70450 Seremban,
Negeri Sembilan, Malaysia.
call
+60 (0) 6-676 0361
print
+60 (0) 6-677 0151
mail
ktadvancesystem@gmail.com
 
Malaysia

Sarawak, Malaysia

KT Dynamic Sdn. Bhd.

1st Floor, Lot 1202, Sublot 4,
Jalan Muara Tabuan, 93350,
Kuching, Sarawak.
call
+60 (0) 8-236 2328
print
+60 (0) 8-236 2358
mail
ktdsarawak@gmail.com
 
Malaysia

Indonesia

PT. KT Engineering

Ruko Noterdame Blok B No.17
Kota Delta Mas Desa Sukamathi,
Kecamatan Cikarang Pusat,
Bekasi 17350, Indonesia.
call
+62 (0) 21-8997 3902
print
+62 (0) 21-8997 3903
mail
ptktengineering@gmail.com
 
Malaysia

Indonesia

PT. KT Engineering (Jakarta Sales Office)

Gedung Kopi 4F Room
404 JL.RP.Soeroso No. 20 Cikini,
Menteng, Jakarta.
call
+62 (0) 21-2123 3080
print
-
mail
ptktengineering@gmail.com
 
Copyright © 2021 by Kasui Techno. All rights reserved.